Case Study: Royal HaskoningDHV and BIM
LRQA's Building Information Modelling Level 2 accreditation is helping improve project delivery at Royal HaskoningDHV
ACP Europe: Defining a food safety culture.
Beyond conventional industry standards with FSSC 22000 food safety certification
Thales UK: Seeing what’s on the environmental horizon and acting.
Seeing what’s on the environmental horizon and acting. Gap analysis to help meet revised standard, ISO 14001:2015. Read more in our case study.
Doubling power plant production with LRQA
Design appraisal and inspection services to convert a fossil-fired power plant to a Combined Cycle Gas Turbine (CCGT) plant. Read more in our case study.
Virtual construction
Independent validation of Building Information Modelling (BIM) readiness for a leading civil engineering contractor. Read more in our case study.
Making a European power plant out of components from Asia.
Our client needed to be confident about the technical quality control process of its main Engineering, Procurement and Construction (EPC) contractor in Asia.
Case study: Managing the risk for Hywind Demo (Statoil)
Combining existing technologies with a need for new energy sources, Statoil led the development of Hywind, the world’s first full-scale floating wind farm. The ground-breaking project presented many challenges - so they asked for our help.
Gas to the Netherlands
Independent appraisal and inspection services for the Norgron pipeline, Nederlandse Aardolie Maatschappij BV. Read more in our case study.
Exporting Sungjin Geotec components
Meeting contracts and regulations. Increasing export of heavy industry system components for power and process plant and the offshore industry.
ASC certification aids growth for Loch Fyne Oysters
Loch Fyne Oysters is a seafoods, fish, meat, oysters and game company which also founded the Loch Fyne restaurant chain